Using the survey with your contractor and permits
The written survey lists each material sampled, where it is, how much there is and the lab result, and it must be kept on site while the work is under way. Give a copy to your general contractor and to every trade that will cut or demolish. A remodeler who does not hold the CSLB asbestos classification or certification needed for the job has to subcontract the abatement, so ask who is actually doing the removal.
For demolition, the district notification number travels with your city permit application under state law. Renovation permits are handled by the city building department, and we have not confirmed Menifee's own checklist, so ask the permit counter what asbestos documents they want with your plans. Commercial and multi-unit projects follow the same survey and notification rules, with more occupants to coordinate around.
Once the consultant's report is back, it often shows one material doing most of the damage to the schedule, such as glued-down tile and black adhesive under a Sun City kitchen, which asbestos floor tile and mastic removal covers in depth. Ceilings, ducts and manufactured homes are summarized on the Menifee Asbestos Removal homepage.